Flowman were delighted to be asked to refit Loanhead Leisure Pool by the local authority. It’s a 25 metres, 4-lane swimming pool. Flowman project managed the removal of the mosaic tiles and replacement with modern large tiles for easier maintenance.
1: The pool in its original state with small mosaics

3: The pool at an early stage of applying the screed for the new tiles

4: The pool at a later stage of applying the screed.

2: The pool with old mosaics removed.


5: Choices Choices. looking at samples of tiles for colour and size etc

6: The team are making excellent progress!

7: Almost finished. Walls done. Floor done and protective sheets laid. Only the grout to be done and the new fittings to be installed.

8: WOW !! What a transformation. Job completed on time and within budget. Happy client.